| Click Here for Printer Friendly Version | ||
![]() |
![]() |
![]() |
| BEFORE | AFTER | |
| Vacuum Chamber PM Technique | ||
| MultiPlex ICP STS-RIE Chamber Wall Clean | ||
| OBJECTIVE: | ||
| TO EFFECTIVELY PM THE ETCH STS-RIE CHAMBER IN A TIMELY MANNER, WHILE IMPROVING TOOL RECOVERY AND PARTICLE PERFORMANCE | ||
| Vacuum Chamber: | STS-RIE / ETCH CAVITY |
|
| Vacuum Chamber Process Residue: | PROCESS INDUCED RESIDUE |
|
| Vacuum Chamber Components: | CHAMBER WALL |
|
| Old Procedure: | 5 to 6 days |
|
Tool Recovery: Extended recovery time, outgassing and particle issues |
||
| New Procedure: | DI water, Foamtec Products, 1 hour, 1 technician |
|
Tool Recovery: Reduced recovery time and no particle issues |
||
Vacuum Chamber Products:
- (3) HT4536D-1 360 Grit Diamond ScrubPAD
- (1) FTPEN-1 ScrubWRIGHT™ Pen
- (1) HT4536DW-5 360 Grit Diamond ScrubBELT®
- (2) HT4754 UltraSOLV® Sponge
- (1) HT5790S-25 MiraWIPES® (25 wipes)
- (1) HT4794 UltraSOLV® Foam Wiper
- (1) HT1502-10 MiraSWAB® 3" Rigid Tip
- (1) HT1511-10 MiraSWAB® 4" Flexible Oval Head Tip
View "How to" instructional videos on http://www.foamtecintlwcc.com/video/
| Step 1: | Using proper procedures and safety guidelines properly prepare STS-RIE for chamber scrub |
| Step 2: | Using DI water, moisten an UltraSOLV® Sponge and a Diamond ScrubPAD. Ring-out sponge to ensure foam is moist throughout the sponge. Keep the sponge slightly damp with DI water (See Fig 1) |
![]() |
|||
Fig 1: Dampen UltraSOLV® Sponge and Diamond ScrubPAD with DI water |
|||
| Step 3: | Using a dampened UltraSOLV® Sponge, wipe chamber plate and wall removing the surface particles and avoiding the powder fly around the chamber (See Fig 2) |
| Step 4: | Using a dampened 360 Grit Diamond ScrubPAD, scrub chamber wall and outlet side of turbo pump. Keep the Diamond ScrubPAD slightly moist with DI water (See Fig 2 & 3) |
![]() |
![]() |
||||
Fig 2: UltraSOLV® Sponge wiping chamber wall |
Fig 3: 360 Diamond ScrubPAD scrubbing entire chamber and chamber wall |
||||
| Step 5: | As loosened deposition begins to build up on chamber wall, take UltraSOLV® Sponge and wipe the area free of deposition |
| Step 6: | When ScrubPAD loads up with deposition, pull across UltraSOLV® Sponge to unload ScrubPAD. This ensures the function and efficiency of the sponge (See Fig 4 & 5) |
![]() |
![]() |
Fig 4: Pull ScrubPAD across UltraSOLV® Sponge |
Fig 5: Unloaded ScrubPAD |
| Step 7: | Rinse sponge as necessary by rinsing with DI water to free UltraSOLV® Sponge of excess deposition (See Fig 6 & 7) |
![]() |
![]() |
|||
Fig 7: Loaded-up UltraSOLV® Sponge |
Fig 8: UltraSOLV® Sponge AFTER rinse |
|||
| Step 8: | Repeat steps 3 ? 7, scrubbing the remaining areas of the chamber plate & wall assembly. Rinse UltraSOLV® Sponge and unload 360 Grit Diamond ScrubPAD as necessary |
| Step 9: | When deposition has been sufficiently removed throughout the entire chamber assembly, remove gloves and replace with a new set in preparation for Final Wipe Procedure |
| FINAL WIPE PROCEDURE: | ||
IMPORTANT NOTE |
||
| THE USE OF HT5790S MiraWIPES® AND HT1511FC MiraSWABS® DURING FINAL WIPE PORTION OF PROCEDURE IS A CRITICAL STEP TO EFFECTIVELY REMOVING PARTICLE DEFECTS FROM THE CHAMBER | ||
Figure below shows how much more deposition the Foamtec International MiraWIPE® can remove from a critical surface compared to the standard fab wiper, making the MiraWIPE® FINAL WIPE PROCEDURE the most CRITICAL STEP of the PM procedure (See Fig 11a & 11b) |
||
![]() |
||
Fig 11a: Current fab wiper after completely wiping chamber |
Fig 11b: Particles picked up using HT5790S MiraWIPES® after completely wiping with current fab wiper |
|
MiraWIPES® are the KEY STEP for DEFECT REDUCTION and IMPROVED TOOL RECOVERY |
||
| Step 10: | Use a MiraWIPE® dampened with IPA and wipe up all of the moisture and/or loosened deposition that surfaces from N2 gun blowing N2, or CDA into the sealing areas and screw holes (See Fig 9) |
![]() |
|||
Fig 9: Use N2 gun to blow out the moisture and loosened deposition inside sealing, screw holes and corners |
|||
| Step 11: | Use a HT5790S MiraWIPE®, apply IPA and proceed to wipe entire RIE-PC chamber wall assembly |
| Step 12: | Prior to closing chamber, use a clean MiraWIPE® dampen with IPA and perform a final complete chamber wipe-down |

FIG 10: COMPLETED STS-RIE CHAMBER WALL ASSEMBLY SCRUB
PARTS CLEANING
| Step 13: | Use the FTPEN, combined with the Diamond ScrubBELT® (HT4536DW-5), scrub inside the chamber cover to remove film. Keep slightly dampened with DI water, and remove the deposition by wiping with UltraSOLV® Sponge (See Fig 11) |
![]() |
|||
Fig 11: FTPEN and 360 Grit Diamond ScrubBELT® scrubbing inside chamber cover |
|||
| Step 14: | Use MiraSWABS® (HT1502 MiraSWAB® 3" Rigid Tip & HT1511 MiraSWAB® 4" Flexible Oval Head Tip) dampened with IPA to clean the parts screw holes and o-ring trench (See Fig 12) |
![]() |
|||
Fig 12: MiraSWAB® cleaning the screw holes and o-ring trench |
|||
| Step 15: | Use a HT5790S MiraWIPE®, apply IPA and proceed to wipe entire STS-RIE chamber cover (See Fig 13) |
![]() |
|||
Fig 13: Apply IPA to MiraWIPE®, and proceed to wipe chamber cover |
|||
| Step 16: | Use the UltraSOLV® foam wiper dampened with IPA to clean the ceramic & bead blasted parts (See Fig 14 & 15) |
![]() |
![]() |
Fig 14 &15: Use UltraSOLV® foam wiper dampened with IPA to clean the ceramic and bead blasted parts
















