Hitachi Metal Etcher
OBJECTIVE:
TO EFFECTIVELY PM THE HITACHI METAL ETCHER IN A TIMELY MANNER, WHILE IMPROVING TOOL RECOVERY AND PARTICLE PERFORMANCE
 
Vacuum Chamber: HITACHI METAL ETCHER
Vacuum Chamber Process Residue: PROCESS INDUCED RESIDUE
Vacuum Chamber Components: CHAMBER, CHAMBER WALLS, VIEWPORT, PUMP PORT
Old Procedure: Silicon carbide 600 grit & standard fab wipers
(From the build up found on the tool, it was evident that this method was not effective to get the surface back to bare metal)
New Procedure: Diamond ScrubPAD, UltraSOLV® Sponge, DI water, and IPA for final wipe with MiraWIPES®
Foamtec Products
Vacuum Chamber Products:
(1) HT4754 UltraSOLV® Sponge
(1) FT901 ErgoSCRUB® Handle (with hook and loop)
(2) HT4528DC3-1 280 Grit Diamond ScrubDISK®
(2) HT4528D-10 280 Grit Diamond ScrubPAD
(5) HT175036D-5 360 Grit Diamond ScrubTIP®
(5) HT4790-5 UltraSOLV® Wipers
(1) HT4580D-10 800 Grit Diamond ScrubPAD
(5) HT1702-5 UltraSOLV® Swab
(4) HT5790S-5 MiraWIPE® 9x9 wide sealed edge
 
Hitachi Metal Etch PM Procedure:
View “How to” instructional videos on http://foamtecintlwcc.com/video/
NOTE: INITIAL CLEAN MAY REQUIRE THE USE OF ADDITIONAL PRODUCTS TO EFFECTIVELY CLEAN CHAMBER BACK TO BARE METAL, IT IS RECOMMENDED TO PERFORM A ROUND OF 2-3 PM'S ON SAME TOOL TO ESTABLISH SUFFICIENT DATA FOR EVALUATION
Step 1: Using proper procedures and safety guidelines, shutdown and prepare Hitachi Metal Etch Chamber for wet clean
Step 2: Effectively place 4 or 5 MiraWIPES® over vacuum pump to protect from DI water
Step 3: Properly stage a container of DI water next to the chamber and place a HT4528D 280 Grit Diamond ScrubPAD and a HT4754 UltraSOLV® Sponge into the container (See Fig 1)
Place in container of DI water
Fig 2: Place Diamond ScrubPAD and UltraSOLV® Sponge in container of DI water
Red Arrow
Step 4: While wearing breathing apparatus, take the HT4754 UltraSOLV® Sponge and wipe the inside of the chamber to remove excess process residue
Step 5: Take the dampened 280 Grit Diamond ScrubPAD and scrub a 6” x 6” area within the chamber wall. Scrub this area until deposition is effectively removed lightly dampened 140 Grit Diamond ScrubPAD and scrub a small area of the process chamber (See Fig 3)
Step 6: Wipe-down the affected chamber area using the DI water dampened UltraSOLV® sponge
Step 7: As necessary, unload the ScrubPADS of deposition by wiping the ScrubPADS with HT4754 UltraSOLV® Sponge in one direction (See Fig 2, 3 & 4)
ScrubPAD loaded with deposition
Pull ScrubPAD across sponge
Unloaded ScrubPAD
Fig 4: ScrubPAD loaded with deposition
Fig 5: Pull ScrubPAD across UltraSOLV® Sponge
Fig 6: Unloaded ScrubPAD
NOTE: REMEMBER TO UNLOAD UltraSOLV® SPONGE WHEN IT BECOMES LOADED WITH DEPOSITION BY RINSING SPONGE IN CONTAINER OF DI WATER (See Fig 5 & 6)
Loaded UltraSOLV Sponge
Fig 7: Loaded-up UltraSOLV® Sponge
UltraSOLV after rinse
Fig 8: UltraSOLV® Sponge AFTER rinse
Step 8: Repeat steps 5 – 7 to remove remaining process residue from affected area in the chamber, tunnel, and vacuum chamber walls using the same method as described above
Step 9: In order to remove deposition from the remaining hard to reach areas (such as the o-ring grooves and corners), use the HT175036D 360 Grit Diamond ScrubTIP® to effectively reach these areas (See Fig 7 & 8)
Use Diamond ScrubTIP
Diamond ScrubTIP
Fig 7 & 8: Using Diamond ScrubTIP® to clean hard to reach areas and o-ring grooves
Red Arrow
NOTE: Unload the ScrubTIP® as necessary, using the same method as described above in step 7 to unload the ScrubPADS
Step 10: For the flatter surfaces, of the chamber, tunnel or vacuum chamber, apply the HT4528DC3 280 Grit Diamond ScrubDISK® to the FT901 ErgoSCRUB® Handle. Dampen the ScrubDISK® with DI water and scrub affected area. Unload excess deposition from the ScrubDISK®, using the same method as the ScrubPADS described in step 7 above
Step 11: Use the HT4580D 800 Grit Diamond ScrubPAD to effectively polish all of the previously scrubbed surfaces within the chamber. Unload the ScrubPAD as described in step 7 as necessary
Step 12: Using IPA with the HT4790 UltraSOLV® Wipers and HT1702 UltraSOLV® Swab, perform a THOROUGH AND EFFECTIVE WIPE-DOWN of the main chamber, vacuum chamber and tunnel, so that all remaining flakes are removed
FINAL WIPE PROCEDURE:
IMPORTANT NOTE
THE USE OF HT5790S MIRAWIPES® DURING FINAL WIPE PORTION OF PROCEDURE IS A CRITICAL STEP TO EFFECTIVELY REMOVING PARTICLE DEFECTS FROM THE HITACHI METAL ETCHER
 
Figure below shows how much more deposition the Foamtec International MiraWIPE® can remove from a critical surface compared to the standard fab wiper, making the MiraWIPE® FINAL WIPE PROCEDURE the most CRITICAL STEP of the PM procedure (See Fig 12a & 12b)
MiraWIPES are more effective
Fig 12a: Current fab wiper after completely wiping Hitachi Metal Etcher
Fig 12b: Particles picked up using HT5790S MiraWIPES® after completely wiping with current fab wiper
Red Arrow
Red Arrow
MiraWIPES® are the KEY STEP for DEFECT REDUCTION and IMPROVED TOOL RECOVERY
Step 13: Using the HT5790S MiraWIPES®, moistened with IPA, wipe the entire Hitachi Chamber
Step 14: Ensure to wipe down the main chamber, vacuum chamber, and tunnel area with the MiraWIPES®. Be sure to include all pump ports, view ports, vacuum seal surfaces, o-rings and any parts to be placed back into the Hitachi Chamber
Step 15: Perform Hitachi Metal Etch tool recovery as outlined by manufacturer