| LAM 9400 Poly Etch Chamber PM Procedure: |
|
| View “How to” instructional videos on http://foamtecintlwcc.com/video/ |
|
| Step 1: |
Using proper procedures and safety guidelines, properly prepare LAM 9400 POLY ETCH Chamber and Foamtec International products for wet scrub PM (See Fig 1) |
|
| |
|
|
 |
|
| |
Fig 1: LAM POLY ETCH Chamber with PM parts |
|
| |
|
|
| Step 2: |
Fill a plastic container with approximately 2” to 3” of DI water and place HT4754 UltraSOLV® Sponge and HT4580D-1 800 Grit Diamond ScrubPAD in container of DI water to moisten (See Fig 2) |
| |
| |
 |
|
|
|
| |
Fig 2: UltraSOLV® Sponge and Diamond ScrubPAD in DI water |
|
| |
|
| |
| Step 3: |
Take damp UltraSOLV® Sponge and perform an initial wipe of the entire LAM POLY ETCH Chamber. Rinse out sponge in container of DI water as necessary |
| |
| Step 4: |
Take damp UltraSOLV® Sponge and wipe a small area within the LAM POLY ETCH Chamber that is to be scrubbed. Ensure to keep area moist with DI water during scrub |
| |
| NOTE: |
MAY WANT TO REDUCE CHAMBER BODY TEMPERATURE TO HELP KEEP DI WATER FROM EVAPORATING QUICKLY (See Fig 3) |
|
| |
|
|
 |
|
| |
Fig 3: Wiping a small area within LAM ETCH Chamber |
|
| |
|
|
| |
 |
|
|
|
| |
Fig 13: HT5790S Foamtec International MiraWIPE® |
|
| |
|
|
| Step 16: |
Fold the HT5790S MiraWIPES® into quarters and apply IPA to the MiraWIPES®, then wipe entire LAM POLY ETCH CHAMBER (See Fig 14) |
| |
| |
|
|
|

|
| |
|
| |
Fig 14: HT5790S Foamtec International MiraWIPE® with IPA |
|
| |
|
|
| |
| Step 17: |
If available, recommend using clean dry air or N2 to blow out moisture from tight corners and edges that you are not able to effectively reach with MiraWIPES® (See Fig 15) |
| |
| |
|
|
 |
|
| |
Fig 15: Using clean dry N2, blow out moisture from tight corners and edges of chamber |
| |
|
| |
| Step 18: |
In addition to using the MiraWIPES®, apply IPA to the HT1511FC-5 MiraSWABS® and wipe all of the hard to reach areas and o-ring grooves (See Fig 16) |
| |
 |
|
|
|
 |
| |
| |
| |
Fig 16: HT1511FC MiraSWAB® wiping corners and o-ring grooves with IPA |
| |
|
| |
| Step 19: |
When finished with turbo pump chamber, wipe down with HT5790S MiraWIPE® and IPA, using same technique. Return to other end of process chamber to perform FINAL WIPE PROCEDURE |
| |
| Step 20: |
During FINAL WIPE PROCEDURE, ensure to remove isolation valve from within slit-valve area and wipe with MiraWIPE® and IPA. This area is very susceptible to accumulating loose particles (See Fig 17) |
| |
|
| |
| Step 21: |
While isolation valve is removed take HT1511FC MiraSWAB® and dampen with IPA and effectively wipe out the isolation valve o-ring groove (See Fig 18 & 19) |
| |
 |
|
|
|
 |
| |
| |
Fig 18 & 19: HT1511FC MiraSWAB® wiping isolation valve o-ring |
| |
| |
|
| |
| Step 22: |
Using HT5790S MiraWIPE® with IPA wipe out entire isolation valve area while valve is removed |
| |
| Step 23: |
During FINAL WIPE PROCEDURE recommend opening top portion of process chamber to wipe with MiraWIPE® and IPA. This area is also very susceptible to accumulating loose particles (See Fig 20, 21 & 22) |
| |
| |
 |
|
 |
|
| |
Fig 20: Removing hardware to open top portion of process chamber |
|
Fig 21: Top portion of chamber removed |
|
| |
|
|
|
|
| |
|
|
 |
|
| |
| |
| |
Fig 22: Loose particles accumulate along edges of POLY ETCH Process Chamber |
|
| |
| |
|
|
|
|
|
| |
| Step 24: |
Dampen the remaining HT1511FC MiraSWABS® with IPA and proceed to wipe out all remaining o-rings grooves |
| |
| Step 25: |
Recommend removing and replacing all o-rings throughout LAM POLY ETCH Chamber |
| |
| Step 26: |
When finished with complete chamber wipe down, use the remaining HT5790S MiraWIPES® and wipe down ALL parts being placed back into chamber |
| |
| Step 27: |
Take all the LAM POLY ETCH parts that are to be cleaned into Parts Clean Shop and, using the same technique as described above, proceed to take second HT4580D 800 Grit Diamond ScrubPAD and perform a wet scrub on all parts to be placed back into chamber (See Fig 23, 24 & 25) |
| |
 |
|
|
|
 |
| |
Fig 23 & 24: LAM POLY ETCH window assembly being cleaned on wet bench |
| |
|
|
| |
 |
|
|
|
| |
Fig 25: LAM POLY ETCH clean window assembly |
| |
|
| |
| Step 28: |
Ensure to use additional MiraWIPES® with IPA and WIPE DOWN ALL PARTS being placed back into LAM POLY ETCH Chamber. Using LAM’s safety guidelines and procedures bring LAM Poly Etch Chamber back up to production |